THE LEEPER ARCHIVE

ARCHIVE 002 · CHAPTER 19 · CANON PACK

LESS POWERFUL
BY DESIGN.

A rejected central Director, a distributed working charter, deliberate sabotage and a seven-day convenor role that expires unless others renew it.

16 CANON ENTRIES · 7 UNTESTED TCG CANDIDATES · A2-CH19-20260926-R1

Established story material

A2-CHAR-ARUN · Character

Arun Vey

Rejects the proposed Director of Essential Systems role because it would recreate a citywide emergency key around one signature. He instead develops a distributed working charter, then tests those principles during the southern exchange sabotage and accepts only a short, renewable convenor role.

Chapter evidence: paragraph 1, paragraph 13, paragraph 26, paragraph 54, paragraph 100, paragraph 138, paragraph 172, paragraph 249, paragraph 277, paragraph 281, paragraph 321, paragraph 372, paragraph 404, paragraph 467, paragraph 501, paragraph 539, paragraph 576, paragraph 627, paragraph 647, paragraph 657, paragraph 676, paragraph 690

Illustration continuity

Council House working papers, exchange repair boards and temporary charter drafts; avoid depicting Arun as a triumphant central ruler.

A2-CHAR-VOSS · Character

Halden Voss

Offers Arun a central Director role in the name of accountability, repeatedly argues for a central override, and later uses the sabotage to renew the case for clear emergency command. He eventually accepts a narrower, temporary convenor arrangement for further negotiation.

Chapter evidence: paragraph 13, paragraph 26, paragraph 44, paragraph 68, paragraph 118, paragraph 138, paragraph 172, paragraph 191, paragraph 249, paragraph 277, paragraph 372, paragraph 404, paragraph 521, paragraph 576, paragraph 597, paragraph 647, paragraph 657

Illustration continuity

Long Council House table with the Director proposal; keep the argument institutional rather than villainous.

A2-CHAR-NARA · Character

Nara Venn

Pushes for affected-public representation, warns that distributed engineering power can also become unelected government, and helps define emergency service priorities during the blackout without turning those priorities into direct technical commands.

Chapter evidence: paragraph 44, paragraph 68, paragraph 100, paragraph 118, paragraph 172, paragraph 191, paragraph 249, paragraph 277, paragraph 404, paragraph 458, paragraph 576, paragraph 597, paragraph 627, paragraph 657, paragraph 676

Illustration continuity

Charter table, district-priority call and public-comment board rather than a rally portrait.

A2-CHAR-MARIAN · Character

Marian Vale

Supports separation of system control from property claims, adds a non-title condition to temporary power acceptance, and insists the working charter cannot turn operational control into ownership or succession status.

Chapter evidence: paragraph 54, paragraph 138, paragraph 191, paragraph 249, paragraph 277, paragraph 458, paragraph 467, paragraph 576, paragraph 627, paragraph 676

Illustration continuity

Contract-condition note beside power-transfer records; no inheritance symbolism.

A2-CHAR-ELIZA · Character

Eliza Marr

Insists that observed emergency practice remain distinct from proposed governance rules, preserves the sabotage evidence, and archives both the rejected Director proposal and the working charter so later accounts cannot erase alternatives that were seriously considered.

Chapter evidence: paragraph 54, paragraph 118, paragraph 172, paragraph 321, paragraph 348, paragraph 458, paragraph 576, paragraph 597, paragraph 627

Illustration continuity

Comparison folders: Director proposal, working draft, sabotage evidence.

A2-CHAR-HOLT · Character

Merin Holt

A western engineer who initially supports formal authority equal to engineering responsibility, survives the southern exchange sabotage with injuries, and later backs the distributed charter because concentrating authority in one expert would make expertise inheritable as office.

Chapter evidence: paragraph 79, paragraph 86, paragraph 321, paragraph 539, paragraph 576, paragraph 597

Illustration continuity

Engineer with splinted hand reviewing exchange and charter remotely; avoid martyr portrait.

A2-OBJ-DIRECTOR-PROPOSAL · Rejected authority proposal

Director of Essential Systems

Would make one Director's signature valid across designated essential systems and allow binding emergency instructions until withdrawal or custodial supersession. Arun rejects the proposal as another Master-shaped office.

Chapter evidence: paragraph 13, paragraph 17, paragraph 21, paragraph 26, paragraph 54, paragraph 138, paragraph 172, paragraph 647

Illustration continuity

Formal first page with broad signature powers, visibly separated from the later working draft.

A2-OBJ-FOUR-PART-BOARD · Governance proposal

The Four-Part System Board

The working design separates technical operators, worker representatives, affected districts and public audit. No constituency is allowed to absorb the others, and technical safety limits remain distinct from service priorities.

Chapter evidence: paragraph 100, paragraph 104, paragraph 108, paragraph 112, paragraph 118, paragraph 191, paragraph 249, paragraph 627

Illustration continuity

Four labelled blocks around one system diagram; no central throne or master node.

A2-OBJ-CONFLICT-PROCEDURE · Governance procedure

Proposed Conflict Procedure

Requires conflicting systems to publish current state and minimum safe condition, then seek feasible configurations without forcing one system below its stated safety minimum. The text is explicitly labelled as proposed and derived from one emergency, not automatic law.

Chapter evidence: paragraph 172, paragraph 176, paragraph 180, paragraph 184, paragraph 188, paragraph 191

Illustration continuity

Two-system state comparison with PROPOSED / NOT YET ADOPTED heading.

A2-OBJ-NO-OVERRIDE · Charter principle

No Permanent Central Override

The working charter repeatedly rejects a permanent citywide emergency override. Temporary emergency actions may exist, but they expire automatically and require multi-constituency renewal.

Chapter evidence: paragraph 138, paragraph 277, paragraph 383, paragraph 627

Illustration continuity

Single charter clause with expiry and renewal notes, not a broken-key metaphor.

A2-EVENT-SOUTHERN-SABOTAGE · Event

The Southern Power Exchange Sabotage

A deliberate physical bypass defeats a protection sequence at the southern exchange, killing four engineers and blacking out three districts. No perpetrator, black-seal credential or UNKNOWN identity use is established at the site.

Chapter evidence: paragraph 281, paragraph 284, paragraph 321, paragraph 334, paragraph 348, paragraph 352

Illustration continuity

Damaged protection cabinet, machined bypass strip and dark system board; avoid graphic casualties.

A2-OBJ-RESTORATION-REQUEST · Emergency coordination record

Publish Available Capacity

Instead of issuing one citywide restoration order, Arun asks stations to publish transfer capacity, minimum safe load, staffing and hazards while remaining inside local operating limits. This produces a distributed repair plan.

Chapter evidence: paragraph 404, paragraph 408, paragraph 412, paragraph 416, paragraph 420, paragraph 424, paragraph 428, paragraph 432, paragraph 436

Illustration continuity

Multiple local capacity lines feeding a shared restoration board.

A2-OBJ-NON-TITLE-POWER · Emergency legal condition

Temporary Power Acceptance — No Title

Marian conditions emergency use of private industrial generation so temporary power acceptance does not establish title, succession, exclusive supply rights or continuing priority.

Chapter evidence: paragraph 458, paragraph 463, paragraph 467, paragraph 471, paragraph 475

Illustration continuity

Short condition sheet attached to industrial supply acceptance.

A2-OBJ-WORKING-CHARTER · Governance draft

Essential Systems Charter — Working Draft

The post-sabotage draft combines technical limits, worker and district representation, public audit, automatic expiry, publication, narrow flight-command exceptions and no permanent override. It remains a working draft, not enacted municipal law.

Chapter evidence: paragraph 627, paragraph 631, paragraph 635, paragraph 639, paragraph 643, paragraph 647, paragraph 657, paragraph 676, paragraph 680

Illustration continuity

Annotated draft with multiple constituencies and WORKING DRAFT clearly visible.

A2-OBJ-SEVEN-DAY-CONVENOR · Temporary role proposal

Seven-Day Convenor

Arun agrees only to serve as a temporary first convenor for seven days, renewable by the future board rather than by himself, with public and worker representation required before renewal. The role is deliberately weaker than the offered Director office.

Chapter evidence: paragraph 647, paragraph 651, paragraph 657, paragraph 661, paragraph 665, paragraph 669, paragraph 673, paragraph 676

Illustration continuity

Term card with seven-day expiry and external renewal requirement.

TCG candidates

Untested design candidates only. Costs, statistics, rarity and timing are not approved. No live game rules change in this release.

A2-C19-F01 · Figure · Infrastructure / Influence

Arun Vey, Less Powerful by Design

Gains a temporary coordination benefit only while another constituency can review or renew it; the role expires automatically if that external condition is not met.

Open design question: Use existing turn timing and avoid a separate governance tracker.

Story sources: Arun Vey, Seven-Day Convenor

A2-C19-F02 · Figure · Infrastructure / Knowledge

Merin Holt, Authority Equal to Responsibility

Protects one technical safety refusal from being overridden merely because it delays a broader plan, while leaving service priority decisions contestable.

Open design question: Target only safety-bound technical refusal, not all opposing effects.

Story sources: Merin Holt, The Four-Part System Board

A2-C19-F03 · Figure · Influence

Nara Venn, Representation Before Renewal

Prevents a temporary authority effect from renewing unless an affected-public condition is visibly satisfied.

Open design question: Tie the condition to existing representation/control states.

Story sources: Nara Venn, Seven-Day Convenor

A2-C19-R01 · Record · Authority / Infrastructure

Director of Essential Systems

Offers broad emergency coordination through one signature, but creates a vulnerability to succession or control effects because authority is concentrated in one office.

Open design question: Keep this an explicitly rejected/alternative design candidate rather than canonising the office as enacted.

Story sources: Director of Essential Systems

A2-C19-R02 · Record · Authority / Knowledge

No Permanent Central Override

Forces emergency override effects to carry an expiry and an external renewal condition instead of persisting indefinitely.

Open design question: Avoid simply negating all emergency authority; preserve bounded temporary use.

Story sources: No Permanent Central Override, Essential Systems Charter — Working Draft

A2-C19-E01 · Event · Infrastructure

Southern Exchange Sabotage

Disables one major system and forces linked Places to publish spare capacity and minimum safe states for restoration.

Open design question: Do not reward casualty or sabotage; focus gameplay on recovery.

Story sources: The Southern Power Exchange Sabotage, Publish Available Capacity

A2-C19-R03 · Record · Influence / Infrastructure

Working Draft

Creates several bounded governance permissions without granting full control to any one Figure; amendments remain visible and reviewable.

Open design question: Keep the card concise enough to avoid reproducing the entire charter text.

Story sources: Essential Systems Charter — Working Draft, The Four-Part System Board

Continuity locks

Companion records

A2-037 · Director of Essential Systems
A2-038 · Less Powerful by Design